A boom that lifts people 21 metres up

A four-section telescopic boom with a work basket for a truck-mounted platform. From a sketch to a Fusion 360 model with kinematics, an EN 280 check and a concept the client can decide on before any drawings.

21.2m
working height
17.4m
outreach
10 500mm
extension
±50°basket
slew
THE BRIEF

What had to be delivered

DWG-3141
BRIEF
AP17 · 2026

A new boom for an aerial platform on the slewing base of the client's truck: four sections, a cylinder in the first one pushing out the three smaller ones, and a two-person basket at the head. The client's reference: a white boom with a basket on a truck.

My job: design it for real fabrication, check every joint by calculation and present it so the client can decide before working drawings. After a call with the client the concept was reworked a second time: the section profile, a basket over the cab that slews, boarding from the ground.

AP17 · working position · KeyShot render AP17 telescopic boom in the working position: 3 × 3500 mm extension at 55°, the basket stays level. KeyShot 3D render
POSITIONS

Three positions, one camera

DWG-3141a
POSES
3
AP17 telescopic boom with a work basket: Travel, extension 0 · angle 0° · basket over the cab AP17 telescopic boom with a work basket: Working, extension 3 × 3500 mm · angle 55° AP17 telescopic boom with a work basket: Basket slew, extension 3 × 3500 mm · angle 15° · basket at 50° POSITIONS · 01 / 03
ENGINEERING CONSTRAINT

What made it non-trivial

DWG-3142
CONSTRAINTS
4 ITEMS

Four steel sections weighing over two tonnes must extend in sync and carry people twenty metres up.

Four sections in one. The sections nest inside each other with a clearance and run on nylon slide pads. One cylinder inside the boom extends them, and chains pull the two smaller sections: a 3 × 3500 mm stroke with at least a third of each section's length left in overlap when extended.

The basket always stays level. The boom angle runs from −25° to 80°, the basket floor must stay level. Levelling is hydraulic, no electronics: a master cylinder on the column and an identical slave at the basket, ±0.4° error against the five degrees EN 280 allows.

Boarding from the ground without extending. The boom lowers to −21°, the basket floor ends up 0.68 m above ground, with a fold-down two-rung step under the gate. The gate opens inwards: EN 280 does not allow one that folds down.

Travel over the cab. Folded, the basket is raised to the underside of the boom and sits over the cab without blocking the windscreen. Heights assume a slewing ring 1.3 m above ground; they will be refined once the truck is measured.

SOLUTION

How I solved it

DWG-3143
METHOD
5 STEPS

One master geometry with pose matrices: the Fusion model, the clash checks and every diagram of the concept come from it.

01

Box sections from two press-braked halves welded on the neutral axis: 450×350×6, 394×314×5, 340×280×5 and 286×246×4 mm

02

Extension: a 100/63 cylinder with a 3500 mm stroke inside the boom and pairs of LH1244 and LH1044 leaf chains over plain sheaves; retraction is chained too, so a lowered boom cannot run out on its own

03

Luffing by a Ø160/100 cylinder with a 1000 mm stroke, Ø80 heel pin in bronze bushes

04

The 1300 × 700 basket on a bracket with a Ø60 axis slews ±50° with a lock; guard rail posts 40 × 40

05

Clash check in 27 boom poses and 27 basket slew poses: zero contacts

AP17 · working envelope · concept v2 AP17 boom working envelope: basket floor at 19.2 m, working height 21.2 m, maximum outreach 17.4 m, boom angle −25° to 80°
STRUCTURE

Structure and materials

DWG-3144
BOM
4
4sections
S1…S4
200kg in the basket
everywhere
±0.4°basket
levelling
10EN 280
checks

Sections in high-strength S355MC steel, basket guard in S235, PA6-G nylon slide pads with MoS2, 40Kh steel pins in bronze bushes. LH1244 and LH1044 leaf chains, as on forklifts, tensioned by two bolts.

Calculation to EN 280 for a mobile elevating work platform: two people plus 40 kg of tools, 12.5 m/s wind, 400 N manual force, a 150 % test load. All ten checks pass: sections, chains, cylinders, pins, guard rail, levelling, fatigue and clashes; the highest section utilisation is under 60 % against an 80 % criterion.

DOCUMENTATION

What the client received

DWG-3145
OUTPUT
3 FILES

A ten-page concept: what changed after the discussion, travel position, boarding, working envelope, basket, boom and chains, column and levelling, a calculation summary and the list of truck measurements. With it, KeyShot renders of the four positions, DXF flat patterns and a parts list.

STRUCTURE

Joints up close

DWG-3146a
DETAILS
4 SHOTS
AP17 telescopic boom with a work basket: Section heads: collars, nylon slide pads, extension chains
DET.1Section heads: collars, nylon slide pads, extension chains
AP17 telescopic boom with a work basket: Boom heel on the column: Ø80 pin in bronze bushes, lift cylinder
DET.2Boom heel on the column: Ø80 pin in bronze bushes, lift cylinder
AP17 telescopic boom with a work basket: Basket slew axis Ø60 with a lock, ±50°
DET.3Basket slew axis Ø60 with a lock, ±50°
AP17 telescopic boom with a work basket: Boarding: inward gate and a fold-down two-rung step
DET.4Boarding: inward gate and a fold-down two-rung step
GALLERY

KeyShot renders

DWG-3146
RENDERS
4 SHOTS
RESULT

Result

DWG-3147
RESULT
·

The client sees the boom in every position and understands every decision before paying for fabrication: what changed after the call, why chains and not a wire rope, and why the gate opens inwards.

The next step is measuring the truck. The column and flange are then fitted to the slewing ring, stability with outriggers is checked, and the generator produces working drawings from the same model.

NEXT STEP

Similar task?

DWG-3148
LINKS
4

Send a sketch or a photo, and within 24 hours I'll tell you how long it takes and what I need from you.

Discuss your project Message on Telegram
NEXT CASE · 02 / 16 · Electrical & cabinets ATS and distribution cabinets drawings and 3D by generator
All work in the portfolio →