A canopy for 185 solar modules, 42.9 metres long

The largest steel frame in my portfolio: seven 7-metre cross frames, a 20° roof and five rows of modules down the slope. Model, calculation and a complete drawing package for fabrication and erection.

42 858mm
length
185solar
modules
20°roof
pitch
32drawing
sheets
THE BRIEF

What had to be delivered

DWG-371
BRIEF
Spec No. 10 · 2026

A canopy over a car park with the roof fully covered by 2382 × 1134 mm modules: five rows down the slope, columns at 7 metres, three columns per frame and the lowest module edge 2.3 m above ground.

My job: tell whether this can be built from thin-walled galvanised sections at all, check the loads, and then take the structure to drawings the shop can cut, drill and erect from.

Solar canopy · KeyShot render Solar canopy for 185 PV modules, 42.9 m long: steel frame of seven bays, KeyShot 3D render
ENGINEERING CONSTRAINT

What made it non-trivial

DWG-372
CONSTRAINTS
4 ITEMS

42 metres of roof carrying almost 6.2 tonnes of modules, with cars parked underneath.

Thin-walled sections instead of hot-rolled steel. Beams, columns and purlins are built from 2.5 mm galvanised C-sections placed back to back as built-up I-sections. Light, but sensitive to local buckling, so every member was checked on its own.

Snow and wind on an open canopy. An open mono-pitch roof works in both pressure and uplift. The most loaded beam over the middle column reached 98 % of its capacity; purlins are restrained against uplift.

Longitudinal stiffness. The frames stand only in their own plane. Along the canopy the structure is held by Ø8 cables with turnbuckles and braces between columns.

Foundations in uplift. A column base sees up to 78 kN compression and up to 37 kN uplift. 84 M24 × 1500 anchor studs are cast into a continuous slab with a thickening under every base.

SOLUTION

How I solved it

DWG-373
METHOD
5 STEPS

Seven identical frames, staggered bolted splices where the bending moment is lowest, and standard strut under the modules.

01

2×C250 rafters and columns as built-up I-sections with a packer, 2×C200 purlins, S350GD galvanised steel

02

Purlin splices are staggered at the contraflexure points instead of over the columns

03

76 galvanised 41 × 41 × 2.5 struts, 6 m long, under the modules; modules clamp onto them

04

Bracing: horizontal and inclined braces in the frame, longitudinal Ø8 DIN 3055 cables with M12 turnbuckles

05

C20/25 concrete: a 200 mm slab under the whole canopy and 700 × 700 thickenings at the bases, M24 DIN 975 anchors

Bill of materials · sheet 1 of 32 Solar canopy bill of materials: 26 part positions, C-section columns and rafters, C150 purlins, plates, braces
STRUCTURE

Structure and materials

DWG-374
BOM
4
7frames
7000 mm bays
185modules
2382×1134×30
84anchors
M24 × 1500
896bolts
M12, 8.8

Load-bearing frame of 2.5 mm galvanised S350GD C-sections in built-up profiles; black steel only for packers, gussets and base plates. Fasteners: DIN 6921 bolts, class 8.8, M12 to M20, DIN 985 nuts, DIN 125 washers; Ø8 DIN 3055 cables with turnbuckles, thimbles and clamps.

Model envelope 42 858 × 11 093 × 6 869 mm. Two variants exist: plain and with a 1200 mm billboard frieze along the whole front (38 sheets).

DOCUMENTATION

What went into production

DWG-375
OUTPUT
3 FILES

The package: bill of materials, frame assembly drawings, a drawing for every part with bolt holes, plates for cutting, concreting and anchor layout, cable and module installation.

STRUCTURE

Structure up close

DWG-3076a
DETAILS
4 SHOTS
185-module solar canopy, 42.9 m: Rafter-to-column joint
DET.1Rafter-to-column joint
185-module solar canopy, 42.9 m: 41×41 strut splice connector
DET.241×41 strut splice connector
185-module solar canopy, 42.9 m: Purlin grid from below
DET.3Purlin grid from below
185-module solar canopy, 42.9 m: Column base and anchors
DET.4Column base and anchors
GALLERY

KeyShot renders

DWG-376
RENDERS
3 SHOTS
RESULT

Result

DWG-377
RESULT
·

The client got the key answer before fabrication: the structure can be built from thin-walled sections, and it is clear which members are at the limit. The same project then went on to drawings.

The package is ready for production without recalculation: every part has a drawing, every joint has its fasteners in the bill of materials, and the foundations have an anchor layout.

NEXT STEP

Similar task?

DWG-378
LINKS
4

Send a sketch or a photo, and within 24 hours I'll tell you how long it takes and what I need from you.

Discuss your project Message on Telegram
NEXT CASE · 05 / 16 · 3D printing & electronics STRILA RL-1 drone 3D-printed airframe, camera drive
All work in the portfolio →